Image SHA-256 — flagship-energy_1.png
33a3ed62d77f3780102bed36f0b56e480f6a0c39a407d6daf62b4bdcc23e1b22

Build Your Energy Grid - Complete Power Stack

$50B
In stock
SKU
ENERGY-BUILD-STACK

💳 Available Payment Options

Companies can pay via the structures below. Exact amounts and terms are set per item at agreement. Use the calculator to see approximate payments for a given total and term.

Leave blank to use the product price.
Full amount due upon agreement or by agreed date. Best for simpler deals.
Amount Due:

Sign the license agreement and complete payment via wire transfer.

Equal payments monthly (or quarterly for 24+ months).
Payment Amount:
Frequency:
Total Payments:

Sign the license agreement and complete payment via wire transfer.

Upfront fee (20-30%) + % of net revenue, with minimum annual royalty. Paid quarterly.
Upfront Fee:
Remaining (via royalty):

+ % of net revenue quarterly, with minimum annual royalty. Terms set at agreement.

Sign the license agreement and complete payment via wire transfer.

% of gross or net revenue, no/minimal upfront. Good when revenue is more predictable than milestones.
Structure: % of gross or net revenue

No or minimal upfront cost. Percentage and terms set at agreement based on projected revenue.

Sign the license agreement and complete payment via wire transfer.

Payments at key events: signing, delivery, first sale, regulatory approval, etc.
Typical Milestones:
  • Signing
  • Delivery
  • First Sale
  • Regulatory Approval

Amounts allocated per milestone at agreement. Total equals the agreed price.

Sign the license agreement and complete payment via wire transfer.

Fixed fee per year, renewable. Suits ongoing use, updates, or support. Multi-year discounts possible.
Annual Fee:
Discount:
Total over term:

Sign the license agreement and complete payment via wire transfer.

Lump sum due Net 30, Net 60, or Net 90 after agreement or delivery. Single payment, later date.
Amount Due:
Due Date:

Sign the license agreement and complete payment via wire transfer.

First to market

Publicly online since 2010 · U.S. patent applications since 2012 · inventions offered since 2014. The work of Christopher Gabriel Brown, independently documented.

First posted:
Build Your Energy Grid

Build Your Energy Grid - Complete Power Stack

SKU: ENERGY-BUILD-STACK · Base: $50B · Fully configured: up to $159B

Complete grid-scale power stack: Quantum Battery Seed Two (all ten proofs-of-function + three depositions), Quantum Battery original, QE_IC Quantum Battery + Electromagnetic-IC integrated (15,000 configurations), Artificial Laser Solar Recycle Building, and the Negative Microwave complete family. Ships as one guide bundle plus each constituent's editable source zip.

What ships (multi-link download)

This is a multi-link downloadable product. After purchase you receive 6 downloads on your account page: one lightweight stack guide bundle (build-your-energy.zip, ~3 KB, containing README.md, STACK_MAP.md, and MANIFEST.txt) plus every constituent product below as its own editable source zip.

ConstituentServer path
Quantum Battery Seed Two - complete package (10 POF + depositions) (ZIP)/q/u/quantum_battery_seed_two_complete.zip
Quantum Battery + QE_IC series - GDSII generator (ZIP)/g/e/cd-gdsii-generator.crione.zip
GDSII generator standalone CD image (ZIP)/g/d/gdsii_generator_standalone_cd.zip
Microwave Nuclear Waste Recycling Center - source (ZIP)/parents/08-microwave-nuclear-waste-recycling.crione.zip
Small Microwave Nuclear Waste Recycling - source (ZIP)/parents/17-small-microwave-nuclear-recycler.crione.zip

What you configure at purchase

Custom Options on this page let you tell the design team which piece to prioritise first, which deployment scale to target, and whether to add priority support or escrow / phased delivery. Selections do not remove constituents from your download — you always receive the full stack; they only surcharge for the additional work implied by the choice.

OptionChoiceSurcharge
Primary energy system to deploy firstQuantum Battery Seed Two (10 POF + 3 depositions)
Primary energy system to deploy firstQuantum Battery - original design
Primary energy system to deploy firstQE_IC Quantum Battery + EM-IC integrated (15,000 configs)
Primary energy system to deploy firstArtificial Laser Solar Recycle Building
Primary energy system to deploy firstNegative Microwave complete family
Primary energy system to deploy firstUndecided (bundle includes all - pick per site)
Grid integration scaleLab / proof of function
Grid integration scaleSubstation-scale (up to 10 MW)$5B
Grid integration scaleUtility-scale (up to 500 MW)$25B
Grid integration scaleFull continental grid integration$100B
Priority supportYes - direct line to the design team for one year$7.5B
Escrow / phased deliveryYes - phased delivery under escrow (recommended >$5M)$1.5B

What is NOT included

  • Fabrication capacity. The blueprints describe the design; the buyer arranges the fab / build.
  • Regulatory approval. FCC / FDA / DoD / EPA / applicable-authority filings are the buyer's responsibility.
  • Site & utilities. Land, buildings, grid interconnect, and operating permits are not part of the download.

Target buyer

Teams and sovereigns who need the entire stack in one purchase rather than negotiating a piecewise licence with each constituent product. Individual constituents remain listed on this store at their standalone prices; this flagship exists so a single purchase order covers the whole family together, with integration documentation added.

Support model

Source-code delivery as editable downloads. No license server, no runtime dependency on cri-one.com infrastructure. Optional priority support (checkbox on this page) opens a direct line to the design team for one year, useful for the boundaries between constituents that the docs cannot decide for you.

Licensing

Each constituent ships under its own Master Technology Licensing Agreement. Purchase of this flagship grants the same licence to each piece. Non-transferable, non-exclusive, no derivative works permitted without written consent. U.S. territory unless otherwise negotiated in the purchase.

First-to-market verification

Publicly online since 2010. U.S. patent applications since 2012. Inventions offered since 2014. This flagship posted 2026-07-27.

Write Your Own Review
You're reviewing:Build Your Energy Grid - Complete Power Stack
Copyright © 2009-present Christopher Gabriel Brown. All rights reserved. "STRICT INTELLECTUAL PROPERTY NOTICE: All content, code, scripts, and styles in this file are the exclusive intellectual property of Christopher Gabriel Brown. DO NOT COPY, DISTRIBUTE, OR USE WITHOUT EXPRESS WRITTEN PERMISSION." Under no circumstance is there to be a transfer of Intellectual Property. Christopher Gabriel Brown presents a portfolio of advanced technologies across computing, energy, defense, and data systems. The site features products including the AutoPhi Quantum Processor (3.5 ExaFLOPS with quantum capabilities), Quantum Battery (unlimited energy storage with zero degradation), War Satellite (autonomous defense platform with global surveillance), Electric Jet (zero-emission supersonic propulsion), and specialized systems like nuclear waste recycling, blockchain security infrastructure, and smart wearable platforms. Each product includes complete documentation, manufacturing blueprints, patent protection, and implementation resources, positioning them as production-ready solutions for enterprise, government, and research applications. The collection spans quantum computing, renewable energy, aerospace, cybersecurity, and IoT, emphasizing innovation, patent protection, and technical depth. **Preferred Contact Methods** Christopher Gabriel Brown accepts communication by **email and postal mail only**. No phone calls please. **Email:** crioneaka@outlook.com **Mail:** 1341 Wellington Cove, Lawrenceville, GA 30043-5255, USA | USA-ONLY SALES | United States Dollars only | Email-only contact | No non-US orders accepted