33a3ed62d77f3780102bed36f0b56e480f6a0c39a407d6daf62b4bdcc23e1b22
Build Your Energy Grid - Complete Power Stack
Publicly online since 2010 · U.S. patent applications since 2012 · inventions offered since 2014. The work of Christopher Gabriel Brown, independently documented.
Build Your Energy Grid - Complete Power Stack
SKU: ENERGY-BUILD-STACK ·
Base: $50B ·
Fully configured: up to $159B
Complete grid-scale power stack: Quantum Battery Seed Two (all ten proofs-of-function + three depositions), Quantum Battery original, QE_IC Quantum Battery + Electromagnetic-IC integrated (15,000 configurations), Artificial Laser Solar Recycle Building, and the Negative Microwave complete family. Ships as one guide bundle plus each constituent's editable source zip.
What ships (multi-link download)
This is a multi-link downloadable product. After purchase you receive
6 downloads on your account page: one
lightweight stack guide bundle (build-your-energy.zip, ~3 KB, containing
README.md, STACK_MAP.md, and MANIFEST.txt)
plus every constituent product below as its own editable source zip.
| Constituent | Server path |
|---|---|
| Quantum Battery Seed Two - complete package (10 POF + depositions) (ZIP) | /q/u/quantum_battery_seed_two_complete.zip |
| Quantum Battery + QE_IC series - GDSII generator (ZIP) | /g/e/cd-gdsii-generator.crione.zip |
| GDSII generator standalone CD image (ZIP) | /g/d/gdsii_generator_standalone_cd.zip |
| Microwave Nuclear Waste Recycling Center - source (ZIP) | /parents/08-microwave-nuclear-waste-recycling.crione.zip |
| Small Microwave Nuclear Waste Recycling - source (ZIP) | /parents/17-small-microwave-nuclear-recycler.crione.zip |
What you configure at purchase
Custom Options on this page let you tell the design team which piece to prioritise first, which deployment scale to target, and whether to add priority support or escrow / phased delivery. Selections do not remove constituents from your download — you always receive the full stack; they only surcharge for the additional work implied by the choice.
| Option | Choice | Surcharge |
|---|---|---|
| Primary energy system to deploy first | Quantum Battery Seed Two (10 POF + 3 depositions) | — |
| Primary energy system to deploy first | Quantum Battery - original design | — |
| Primary energy system to deploy first | QE_IC Quantum Battery + EM-IC integrated (15,000 configs) | — |
| Primary energy system to deploy first | Artificial Laser Solar Recycle Building | — |
| Primary energy system to deploy first | Negative Microwave complete family | — |
| Primary energy system to deploy first | Undecided (bundle includes all - pick per site) | — |
| Grid integration scale | Lab / proof of function | — |
| Grid integration scale | Substation-scale (up to 10 MW) | $5B |
| Grid integration scale | Utility-scale (up to 500 MW) | $25B |
| Grid integration scale | Full continental grid integration | $100B |
| Priority support | Yes - direct line to the design team for one year | $7.5B |
| Escrow / phased delivery | Yes - phased delivery under escrow (recommended >$5M) | $1.5B |
What is NOT included
- Fabrication capacity. The blueprints describe the design; the buyer arranges the fab / build.
- Regulatory approval. FCC / FDA / DoD / EPA / applicable-authority filings are the buyer's responsibility.
- Site & utilities. Land, buildings, grid interconnect, and operating permits are not part of the download.
Target buyer
Teams and sovereigns who need the entire stack in one purchase rather than negotiating a piecewise licence with each constituent product. Individual constituents remain listed on this store at their standalone prices; this flagship exists so a single purchase order covers the whole family together, with integration documentation added.
Support model
Source-code delivery as editable downloads. No license server, no runtime dependency on cri-one.com infrastructure. Optional priority support (checkbox on this page) opens a direct line to the design team for one year, useful for the boundaries between constituents that the docs cannot decide for you.
Licensing
Each constituent ships under its own Master Technology Licensing Agreement. Purchase of this flagship grants the same licence to each piece. Non-transferable, non-exclusive, no derivative works permitted without written consent. U.S. territory unless otherwise negotiated in the purchase.
First-to-market verification
Publicly online since 2010. U.S. patent applications since 2012. Inventions offered since 2014. This flagship posted 2026-07-27.