Technical Validation
Subscribe to RSS FeedPlain words for this page
- Technical Validation
- — pre-built engineering evidence packages an acquirer's team can review before committing to a purchase. What you'd otherwise have to reproduce yourself.
- Product Deposition (PDEPO)
- — one product's evidence pack. "Deposition" here means a formal engineering record — not the legal-court kind. Closer to a design review binder.
- What's inside a PDEPO
- — bench reports (real hardware measurements), simulation outputs (SPICE, EM, thermal), and independent verification artifacts (test results not produced by CGB himself).
- The nine projects
- — PDEPO-01 through PDEPO-09 cover: Autocar Platform, OTC Vitamins, Electric Jet, War Satellite, Quantum Battery, Super Dome Communications, One Touch Pagers, Microwave Nuclear Waste Recycling, and Smart Shoe. One PDEPO per project.
Full glossary — Tech Support → Start Here — What is what
Documentation and test evidence ready for an acquirer's engineering review.
What you'd otherwise have to build yourself before committing.
Per item
Bench reports, simulation outputs, and independent verification artifacts.








