Microwave Nuclear Waste Recycling — a facility design for a nuclear-waste utility or reprocessing operator
The Microwave Nuclear Waste Recycling System is a complete engineering package for a plant that takes nuclear waste in and sends material back out, for a utility or reprocessing operator that wants a design it can build.
Who this is for
You hold waste and pay to keep it still — spent fuel, depleted uranium, low-, intermediate- and high-level waste in storage. You run the site, the licenses, the handling. What you lack is a design that turns the stored material into something worth selling. This package is that design, model MWNRS-1000, ready for construction.
What it is
A sealed room three meters on a side and four meters tall, its walls half a meter thick in boron carbide, lead, stainless steel and microwave-transparent ceramic. Around it sit twenty-four magnetrons in a four-by-six grid, tunable and phase-locked. Waste goes in. The array runs a negative phase to loosen the bonds and a positive phase to push the material toward the isotope you want, alternating between the two on a timed cycle. The package carries the chamber and emitter drawings, the material specifications, and fifteen wave-and-frequency data tables.
Why it is for you
The plant does three jobs in one building. It cuts the waste volume by ninety to ninety-five percent, so the pile you pay to store gets small. It recharges depleted uranium to three to five percent uranium-235, reactor grade. It produces the medical isotopes hospitals run short of — technetium-99m, iodine-131, molybdenum-99, cobalt-60 — and puts out more electricity than it uses.
What you would license
A non-exclusive license to use this blueprint. You receive the full engineering package on a single AES-256 encrypted Blu-ray, the passphrase sent separately — among its files, 105 Markdown documents, 22 HTML tools, 19 SVG engineering drawings and four Python programs across six directories, more than 2,000 pages. Regulatory approvals would still be needed. The three core inventions and eight supporting ones stay with the inventor; you buy the use of the blueprint only.
The number
The catalog lists the package at $45,000,000,000, payable by wire invoice. The page also states an IP-only pre-operational valuation of $300 to $450 million for the patent position on its own. A United States non-provisional utility application, No. 19/419,022, was filed on 14 December 2025 and is pending examination.