cri-one
Contents
100%
Your journey

PhantasmPhi CPU Phase II - PHC18 - campus, 470,568 QIC parts - 507 Y-OPS (guaranteed 100 Z-OPS)

Inventory item: 10350 | SKU: phantasmphi-cpu-phase2-phc18_waferstack | Line: PhantasmPhi Phase II

Page: https://cri-one.com/phantasmphi-cpu-phase-ii-phc18-campus-470-568-qic-parts-507-y-ops-guaranteed-100-z-ops.html

Owner and author: Christopher Gabriel Brown (CRI-ONE)

Record date: 8 October 2026

1. The Record in Brief

PHC18 is the campus rung of the PhantasmPhi CPU Phase II ladder: 470,568 QIC-105 parts delivering 507 yotta probability-OPS, 5,068× the guaranteed 100 Z-OPS floor, with 11.9B logical qubits at 790 MW net (D:\special\_inventory\descriptions\10350_phantasmphi-cpu-phase2-phc18_waferstack.md). Its earliest dated disclosure is the owner's own deposition text, printed in Invent Depositions (ISBN 978-1-979767-89-7, first shipped 24 November 2017). Two applications of record cover elements of this product and both are pending: U.S. Application No. 19/722,805 (QBeam send/receive, filed 27 June 2026) and U.S. Application No. 19/829,894 (NRS-1, filed 5 October 2026). The tier was first offered on 5 October 2026 and its item page went live on 8 October 2026. Every file in the package is the owner's fixed, dated expression, marked "(c) 2026 Christopher Gabriel Brown / CRI-ONE. All rights reserved."

2. Proprietary - What Is Owned and How It Is Held

The delivery file of record is phantomcore-phase2-phc18_hybridPhot.zip (115,506 bytes, 35 members), built 5 October 2026 (D:\special\102-phantasm-continues\dist\). Its SHA-256 (505c6ad0...) matches the live delivery hash recorded for phantasmphi-cpu-phc18-hybridphot-rtl-v4.zip (D:\special\102-phantasm-continues\VPS_ZIPS_V4_LIVE_SHA256.txt). The package holds seven file families:

  • rtl\: 6 Verilog files (PHC01 and PHC02 PhantomCore CPU and SoC, sequential divider, SRAM)
  • tb\ and sw\: 2 self-judging testbenches and the hand-assembled self-test program
  • photonic_hdl\: 3 photonic-HDL scaffolds (color_math_alu_photonic.phi, qbeam_wireless_chain.phi, nrs1_room_temp_substrate.phi)
  • anchor\: the PHC01 SKY130 synthesis log, tape-out evidence and SHA-256 anchor list
  • gdsii_generator\: 14 files of Project 67 tape-out tooling
  • Tier documents: LICENSE (17 sections), README, NODE_CONFIG, EDA_ESTIMATE, MANIFEST (per-file SHA-256), CONTACT_INFO

dist\TEST_REPORT.json records 110 checks passed, 0 failures and base-RTL identity confirmed across the ten decade zips, PHC18 among them.

Sole ownership. The LICENSE names "Christopher Gabriel Brown (cri-one.com)" as author and IP holder. No assignment is of record. The grant is non-exclusive, non-sublicensable and non-transferable, and states: "Licensor retains all underlying intellectual property." (LICENSE.md §1, inside the zip).

Secrecy measures of record. The full package goes only to a paying buyer, by private download link, after countersigned NDA and wire settlement (product full description). The mutual NDA is published at https://cri-one.com/nda/ and quoted in delivery emails. The purchase term at https://cri-one.com/terms reads "When you buy, you buy the use of that blueprint only." and must be accepted before the invoice issues (item page, D:\special\crione-static\site-inventory\inventory\item-10350\index.html). LICENSE.md §13 treats the Licensed IP and the Schedule Appendix as Confidential Information, with ten-year survival and no time limit for trade secrets. The public item page carries only the description. These are reasonable secrecy measures within 18 U.S.C. 1839(3).

3. First Art - The Earliest Dated Disclosure

DateRecordWhat it disclosesSource
2017-11-24Invent Depositions, ISBN 978-1-979767-89-7, deps. 815 and 850Array controller over data-center servers; wireless send/receive of cubit dataD:\manager\book-ocr-2017-invent-depositions\MANIFEST.md; IP register lines 1552, 1591
2017 (mark)Deposition 754, 2017 catalogTiered single-to-multiple data-center cores on chipsentries-clean.csv; IP register line 1484
2019 (mark)Deposition 1609Chips built from pico nano voxelsIP register line 682
2026-06-27U.S. Application No. 19/722,805QBeam send/receive chainD:\USPTO Responses\Receipts\N417 exitphi(1).pdf
2026-08-21PHC01 PhantomCore self-test and SKY130 synthesisThe CPU delivered in this tier84-phantasmphi-cpu\build\phc01_sky130.log
2026-10-05PHC18 zip; PHC18 Means-to-Overcome documentFull tier package and process-engineering documentdist\; deploy\means\PHC18_MEANS.md
2026-10-06ASAP7 7 nm timing run; v6 QIC-105 textMeasured base: 786.7 MHz, 493.33 µm²103-autophi-performance-teir\voxel-sim\DELAY_RESULTS.md

Project paths are under D:\special\102-phantasm-continues\. The IP register is D:\special\82-alchemy-calc-two\1 light trigger.txt.

Deposition anchors (DEPOSITIONS_C, entry 10350):

  • Deposition 815, printed book page 133 (scan Image_20260511_0027.pdf): "array controller of process is a brain to make all the cells of any given data center work together and perform in complete success multiple functions of operations essentially a server for other servers" - the coordination behind the campus scope.
  • Deposition 850, printed book page 852 (scan Image_20260511_0028.pdf): "internet data over radio is a specified sending and receiving data connection with radio signals in cubit data information" - the principle of the QBeam send/receive chain linking the 470,568 parts.
  • Deposition 754, 2017 catalog (entries-clean.csv), marked copyright 2017: "single to multiple operation core functions in server and data center use-ages working as a tier based institution" - the tiered multi-part scaling of this rung.
  • Deposition 1609, IP register line 682, marked copyright 2019: "pico nano voxel and elemental compounds for chip processing printing" - the voxel unit in which the QIC-105 part is counted.

Defensive-publication effect. Under 35 U.S.C. 102(a)(1), these dated printed publications are prior art against every later filer on the same subject matter. A challenger must produce a dated record earlier than 24 November 2017 that discloses an array controller making all the cells of a data center work together, joined by a wireless send/receive data link. None is of record. A challenger to the package itself must produce a record earlier than 5 October 2026 that discloses the PHC18 combination. None is of record.

Prior Art Considered and Distinguished

The references below are the ones the owner made of record in the NRS-1 Information Disclosure Statement (D:\special\102-phantasm-continues\patent\NRS-1\IDS.md). The distinctions come from the owner's own notes (PRIOR_ART_REGISTER).

ReferenceTitle as recordedDistinction
US 7,082,772 B2Peltier temperature control system for electronic componentsHardware refusal of unsafe setpoints not addressed
US 6,711,904 B1Active thermal management of semiconductor devicesHardware refusal of unsafe setpoints not addressed
US 9,625,186 B2Cooling system for 3D integrated circuitHardware refusal of unsafe setpoints not addressed
US 6,094,919 APackage with integrated thermoelectric moduleNo BEOL cooler co-patterned with the top-metal reticle
US 2003/0123206 A1Thermal trip power control circuitNo setpoint refusal or conjunction-conditioned safe-to-remove
US 6,496,346 B1Automatic system shutdown following processor thermal conditionNo setpoint refusal or conjunction-conditioned safe-to-remove
US 7,149,907 B2Multi-processor recovery using THERMTRIPNo setpoint refusal or conjunction-conditioned safe-to-remove
US 2022/0262213 A1Temperature indicator for optical moduleNo powered-down plus hand-removal-window conjunction
Venkatasubramanian, R., et al., Nature 413, 597-602 (2001)Thin-film thermoelectric devices with high room-temperature figures of meritMaterials level only; no BEOL integration
Harman, T. C., et al., Journal of Electronic Materials 29, L1-L2 (2000)Nanostructured thermoelectric materials and high-ZT PbSeTe quantum-dot superlatticesMaterials level only; no BEOL integration
LTC1923High Efficiency Thermoelectric Cooler ControllerBidirectional PWM only; no setpoint refusal

The owner's filing analysis also weighed the third-party landscape for the stack items in this tier: wafer-scale (#16), 3D CFET (#13) and photonic-only substrate (#18) (D:\special\102-phantasm-continues\patent\NRS-1\README.md §1). The owner holds those items as trade secret and know-how inside the licensed package. No reference of record discloses the PHC18 combination: QIC-105 parts with on-package QBeam send/receive, scaled to a 470,568-part campus on the NRS-1 normal-temperature substrate and driven by the PhantomCore RTL.

4. First to File - The USPTO Record

U.S. ApplicationFiledStatus of recordWhat it covers for this productSource
19/722,8052026-06-27, 4:14:28 PM ET; Conf. [redacted]PendingQBeam SEND and RECEIVE on every QIC-105 part (stack #7, #17)D:\USPTO Responses\Receipts\N417 exitphi(1).pdf; product description
19/829,8942026-10-05, 8:51:32 AM ET; Conf. [redacted]PendingNRS-1 normal-temperature, hand-removable substrate (stack #12)patent\NRS-1\FILED-RECEIPT-20261005.md; deploy\crione-phantasm-ii.php

Under the AIA, each application is dated by its own effective filing date. 19/722,805 is the owner's dated filing on the QBeam interconnect that joins the 470,568 parts of this campus. 19/829,894 states in ¶ 0001 that it claims no priority. Its specification (¶ 0044) names the Project 102 PhantasmPhi CPU Phase II portfolio as the representative embodiment. The Phase II calculator page states that NRS-1 applies "across every tier" and marks it patent pending. Marking under 35 U.S.C. 292 is correct while these applications are pending:

Patent pending - U.S. Application No. 19/722,805 (QBeam) and U.S. Application No. 19/829,894 (NRS-1).

5. First to Market - The Dated Public Offering

DateEventWhereSource
2026-10-05 05:41:33 UTCStore record created for entity 10350 in the Phase II setcri-one.com (old store)D:\special\102-phantasm-continues\PHASE_II_COMPLETE.md; description file
2026-10-05 05:45 UTC"Phase II shipped" bench-log entrycri-one.com/crione-latest.phpPHASE_II_COMPLETE.md
2026-10-05PHC18 tier carried at $3.8 T on the Phase II calculator pagecri-one.com/crione-phantasm-ii.phpdeploy\crione-phantasm-ii.php; IDS D-3
2026-10-05 08:51 UTCPHC18 v4 delivery zip live; hash recordedcri-one.com store downloadVPS_ZIPS_V4_LIVE_SHA256.txt
2026-10-08Item page published, price $3,800,000,000,000.00https://cri-one.com/phantasmphi-cpu-phase-ii-phc18-campus-470-568-qic-parts-507-y-ops-guaranteed-100-z-ops.htmlitem-10350\index.html
2026-10-08 about 05:50 UTCWire-invoice button live (settlement kind wire, mode live)Item pageD:\special\crione-static\inventory\payment_links.json

The web presence behind these offerings is dated by Internet Archive first captures: crioner.com on 2010-01-23, cri-one.com on 2011-01-28 and buyinvent.com on 2014-03-05 (D:\manager\first-to-market\wayback_evidence.json).

6. Copyright

© 2026 Christopher Gabriel Brown (CRI-ONE). All rights reserved. The package LICENSE and README carry the owner's notice "(c) 2026 Christopher Gabriel Brown / CRI-ONE.", and the item page reads "© 2026 Christopher Gabriel Brown (CRI-ONE), cri-one.com."

Works covered. The expression in this package: the Verilog source text, testbenches and self-test program; the three photonic-HDL scaffolds; the LICENSE, README, Means-to-Overcome document and product text; the GDSII-generator scripts and the SVG product image; and the data compilations NODE_CONFIG, EDA_ESTIMATE and MANIFEST. Copyright arises on fixation (17 U.S.C. 102(a)). It protects this expression, not the ideas or methods (17 U.S.C. 102(b)). The method and structure are held by the pending applications and by confidentiality.

Registrations anchoring the corpus (verified, COPYRIGHT_REGISTER; certificates in D:\manager\_patent_copyright_text.txt): TX 7-491-093 "invent cloud" (2010-10-01); TX 8-056-278 "cri one" (2015-03-02); TX 8-251-642 "cri-one" (2015-12-17); TX 8-396-625 "abstract" (2017-05-09); TX 8-648-723 "2018" (2018-09-10); TX 9-504-677 "estimated" (2025-05-06). Registration is the gateway to suit for U.S. works (17 U.S.C. 411(a)). A certificate made within five years of first publication is prima facie evidence of validity (17 U.S.C. 410(c)).

Human authorship. The protectable core is human-authored: the concept, the numbered depositions written by Christopher Gabriel Brown, and his selection, coordination and arrangement of this package. His direction is on the record in the dated owner corrections of 2026-10-06 that set the credited chain and the guaranteed floors (CREDITED_LADDER_PROCESS.json, the_rule.owner_corrections_2026_10_06). This matches the U.S. Copyright Office registration guidance of March 2023.

Notice practice. Every LICENSE and README in the package carries the dated notice, so an innocent-infringer defense is unavailable (17 U.S.C. 401(d)).

7. Firm Rebuttals

Challenge 1 - "Campus-scale multi-chip computing is old art."

Rebuttal. The owner disclosed tiered single-to-multiple data-center cores, an array controller acting as "a server for other servers", and wireless send/receive of cubit data in Invent Depositions, shipped 24 November 2017 (deps. 815, 850), and in the 2017 catalog (dep. 754). The claimed subject is the PHC18 combination, and the owner's IDS distinguishes each thermal reference (Section 3). A challenger must produce a dated record that discloses that combination before 5 October 2026. None is of record.

Challenge 2 - "Someone filed first."

Rebuttal. U.S. patents are first-inventor-to-file, and each application is dated by its own effective filing date. The owner's filings are dated 27 June 2026 (19/722,805) and 5 October 2026 (19/829,894). His printed depositions of 2017 are prior art against every later filer (35 U.S.C. 102(a)(1)), and the hashed package fixes the PHC18 combination in his hands on 5 October 2026. A challenger must produce the earlier application and show that it claims this combination. None is of record.

Challenge 3 - "There is no issued patent."

Rebuttal. None is claimed. Both applications are pending, and "patent pending" is the correct marking under 35 U.S.C. 292. Independently of the filings, the package is protected by copyright in its expression and by the NDA, the LICENSE §13 confidentiality terms and the blueprint-use purchase term.

Challenge 4 - "It was published, so it is free to use."

Rebuttal. Only the description is public. The RTL, photonic HDL, GDSII tooling and Schedule Appendix go only to a buyer under countersigned NDA. Publication of the description creates prior art against later filers. It grants no license. Use requires the non-exclusive LICENSE, under which "Licensor retains all underlying intellectual property."

Challenge 5 - "AI made it, so there is no copyright."

Rebuttal. The concept and the numbered depositions are Christopher Gabriel Brown's own writing from 2017 forward. The tier scopes, credited chain and guaranteed floors are his dated directions of 2026-10-06 (CREDITED_LADDER_PROCESS.json). Copyright covers his human-authored expression and his selection, coordination and arrangement of the package, per the Copyright Office guidance of March 2023.

Challenge 6 - "The dates can be faked."

Rebuttal. The dates are fixed by third parties. The book carries ISBN 978-1-979767-89-7, an identifier issued through the Bowker ISBN agency, and a CreateSpace (Amazon) ship label of 24 November 2017 (D:\manager\book-ocr-2017-invent-depositions\MANIFEST.md). The Internet Archive's first captures date the web presence to 2010, 2011 and 2014. The USPTO acknowledgement receipts date the filings to 27 June 2026 (Patent Center 77974071) and 5 October 2026 (Patent Center 82703270). The SHA-256 of the delivery zip (505c6ad0dc82930c) equals the live-store hash recorded on 5 October 2026. A challenger must break that hash chain. It holds.

Challenge 7 - "507 Y-OPS from one campus is impossible."

Rebuttal. The figure is defined in the owner's files, and the files show how each part of it is built. The guaranteed floor is 100 Z-OPS. The delivered figure, 507 yotta probability-OPS (5,068× the floor), is the credited chain on the QIC-105 part. The measured base is 0.004625 depositions/clock from an iverilog-verified testbench, 4.9 ops/deposition, and 786.7 MHz with an engine area of 493.33 µm² from the ASAP7 7 nm run (DELAY_RESULTS.md). The named owned-IP credits are ×10 Color-ISA pin (#8), ×3 photon/electron/atomic strands and the 99.998% QEC gate (#4). Power is 790 MW net of LED Power Recycling. QBeam carries bytes and is never counted as compute. The ladder records a Landauer check per rung at net power and 300 K, cleared by at least 678× on every rung (CREDITED_LADDER_PROCESS.json, headline_numbers_v5.landauer). The unit is probability-OPS. The tier's own Possibility and Probability reading is shown to the buyer before purchase.

Challenge 8 - "The chips need exotic cold to run."

Rebuttal. The record says the opposite. NRS-1 holds every chip at normal temperature: a 30.0 °C reference inside a 20.0-40.0 °C normal band (D:\special\99-normal-resonance\README.md) and a hand-removal window of approximately 15.0-40.0 °C (19/829,894, claim 4). The cooling is Peltier nano-magnetic, and the application states its job: "to hold normal, not to reach cold" (UTILITY-APPLICATION.md §5.3).

Challenge 9 - "It is just an idea."

Rebuttal. The package is concrete. It holds 35 files, each recorded by SHA-256 in its MANIFEST or anchor list: six Verilog sources, two testbenches, a self-test program, three photonic-HDL scaffolds, a SKY130 synthesis anchor (1,430,172.899 µm² chip area), 14 files of GDSII tooling, a 17-section LICENSE and a per-file SHA-256 MANIFEST. The package passed the build test with 110 checks and 0 failures (TEST_REPORT.json).

8. Evidence Index

#FileSHA-256 (first 16 hex)What it proves
1D:\special\_inventory\descriptions\10350_phantasmphi-cpu-phase2-phc18_waferstack.mdb33efa7151345a65Name, figures, creation date, price
2D:\special\102-phantasm-continues\dist\phantomcore-phase2-phc18_hybridPhot.zip505c6ad0dc82930cThe 35-file package, LICENSE, notices
3D:\special\102-phantasm-continues\VPS_ZIPS_V4_LIVE_SHA256.txt9117a432a8b31a9cLive delivery hash equals local zip
4D:\special\102-phantasm-continues\dist\TEST_REPORT.json6a3d8c9ed6701334110 checks passed, 0 failures
5D:\special\102-phantasm-continues\103-autophi-performance-teir\CREDITED_LADDER_PROCESS.jsond63414ffcf0e3326Definition of figures; owner corrections
6D:\special\102-phantasm-continues\103-autophi-performance-teir\voxel-sim\DELAY_RESULTS.mdc55d9fe02c0c125dMeasured base (786.7 MHz, 493.33 µm²)
7D:\special\102-phantasm-continues\84-phantasmphi-cpu\build\phc01_sky130.logeb62ee91720231e3PHC01 SKY130 synthesis anchor
8D:\special\102-phantasm-continues\patent\NRS-1\FILED-RECEIPT-20261005.md8045b8e8f2e6a21219/829,894 receipt and marking
9D:\special\102-phantasm-continues\patent\NRS-1\IDS.mdda785ac54303031bPrior art of record; D-3 calculator page
10D:\USPTO Responses\Receipts\N417 exitphi(1).pdf356f9dfee850d7b319/722,805 acknowledgement receipt
11D:\special\102-phantasm-continues\deploy\means\PHC18_MEANS.md825f6456701e2847Dated PHC18 process-engineering document
12D:\special\102-phantasm-continues\deploy\crione-phantasm-ii.phpbd7063343462d962PHC18 tier offered; NRS-1 patent-pending notice
13D:\special\82-alchemy-calc-two\1 light trigger.txt2dcb359de3f1b56dDepositions 754, 815, 850, 1609
14D:\special\crione-static\site-inventory\inventory\item-10350\index.html503a64a81ffdf53fItem page, terms, notice
15D:\special\102-phantasm-continues\105-interposer-performance\sync-out\update_products_qic.php688e5908212881a2Private, on file: builder of the v6 short description

Full hash lines: D:\Rebuttals\_evidence\10350.sha256.

9. Notice Line

© 2026 Christopher Gabriel Brown (CRI-ONE). All rights reserved. Patent pending - U.S. Application No. 19/722,805 and U.S. Application No. 19/829,894.

This invention blueprint: PhantasmPhi CPU Phase II - PHC18 - campus, 470,568 QIC parts - 507 Y-OPS (guaranteed 100 Z-OPS) · $469B.
cri-one.com/phantasmphi-cpu-phase-ii-phc18-campus-470-568-qic-parts-507-y-ops-guaranteed-100-z-ops.html
Payment is by bank transfer through Stripe.
Go to cart
Page 1 of 1
0% read