One full datacenter, 47,057 parts on a chain of dragonfly halls, under a single design licence.
Who it's for: US operators planning an entire datacenter built on QIC-105 parts.
The problem it solves: a datacenter-wide layout of linked halls; listed 50.7 Y-OPS (guaranteed 10 Z-OPS), 79 MW net.
What you get: non-exclusive PHC17 licence to the chip design source files, sent after signed NDA and wire payment.
47,057 parts, one datacenter on the dragonfly-of-dragonflies chain — 50.7 yotta probability-OPS, 5,068× the guaranteed 10 Z-OPS floor; 1.19B logical qubits. 79 MW net.
The part is QIC-105: an 858 mm² full-reticle die in the real 40×40 mm BGA-1536 die-side package, 18-chiplet stack × 1,500 CFET layers = 27,000 voxel-layers, with QBeam SEND and RECEIVE integrated on-package (ExitPhi, USPTO App 19/722,805): Bell-measure transmit → 2 classical bits over the CoolBeam phased array → I/X/Y/Z receive correction; 4-lane chain + PipeBeam ordering + 48-channel nanophotonic transceive. QBeam carries bytes, never compute OPS.
Credited chain (unchanged receipts): 0.004625 depositions/clock (iverilog-verified RTL) × 4.9 ops/deposition × 786.7 MHz measured at 7 nm / 2.75 GHz at 2 nm (#5 EM Cooling, Pat 1096-1098) × ×10 Color-ISA pin (#8) × ×3 photon/electron/atomic strands × 99.998% QEC gate (#4); power net of #1 LED Power Recycling (42%).
The decade/3× figure is the guaranteed floor; the delivered figure is the credited chain on the QIC-105 part. Native unit is probability-OPS; FLOPS-equivalents are provided as a reframed comparison, labeled. QBeam rates are design targets until tape-out and are quoted as interconnect only. Settles by wire or online check.
Payment through Stripe: by bank transfer up to $999,999.99, by card up to $9,999,999,999.99. Above that, or on request: by wire invoice. Questions: christopher@cri-one.com.
Contents 44 files in 1 folder · listed 14 November 2026
This lists the whole project folder, 102-phantasm-continues, which 20 products on this site draw on. What this product delivers is stated on this page under What you get.
Phase II of PhantasmPhi CPU — PhantasmPhi CPU Phase II — PHC17 · wafer-scale monolithic license. Non-exclusive source-licensed RTL + photonic-HDL zip (full 17-section LICENSE, Licensed-IP schedule, PHC01 SKY130 tape-out anchor evidence). Delivered after countersigned NDA + wire settlement. USA companies only, USD only, email + postal mail only.
Footnotes
Product number 10349.
Family: phantasmphi.
Purchase: When you buy, you buy the use of that blueprint only.
For the Curious
A datacenter should be one computer, not many of them sharing a fence. PHC17 is the whole building: 47,057 QIC-105 parts on the dragonfly-of-dragonflies chain, dragonflies joined into a larger one. Each part is an 858 mm² full-reticle die in a 40 by 40 mm BGA-1536 package, eighteen chiplets of 1,500 CFET layers apiece for 27,000 voxel-layers, with QBeam send and receive on-package. QBeam is the photonic wireless chain that carries the building's traffic: a Bell measurement to transmit, two classical bits over the CoolBeam phased array, an I/X/Y/Z correction to receive, four lanes ordered by PipeBeam across 48 nanophotonic channels. It moves bytes, never the compute.
The building delivers 50.7 yotta probability-OPS, 1.19 billion logical qubits, 79 MW net after LED power recycling. That is the credited chain: iverilog-verified depositions per clock, ops per deposition, the clock measured at 7 nm and its 2 nm figure under EM cooling, the Color-ISA pin, the three photon, electron and atomic strands, the 99.998% QEC gate. The guaranteed floor is 10 Z-OPS, cleared 5,068 times over. Probability-OPS is the native unit; a FLOPS figure beside it is gold framing, labeled. QBeam rates stay design targets until tape-out.
This is the wafer-scale monolithic license, for a US datacenter operator: a non-exclusive, source-licensed RTL and photonic-HDL zip with the full 17-section LICENSE, the Licensed-IP schedule and the PHC01 SKY130 tape-out anchor evidence, delivered by email and postal mail after a countersigned NDA and wire or online-check settlement. You walk away with the use of the blueprint; the invention stays with CRI-ONE.